📅 Submission Deadline: N/A  |  Vol. 9, Issue 12, December
Track Paper e-Certificate Contact
📢 NOTICE Call For Paper – Vol. 9, Issue 12 (December)  |  Submission Deadline: N/A  |  IJAREST is UGC Approved (Sr. No. 63628)  |  e-ISSN: 2394-3394  |  Submit original, unpublished research papers in Engineering, Science & Technology  |  Fast peer review (12–15 weeks)  |  Open Access – Free to Read  |  Contact: editor@ijarest.org

Paper Details

Home › Archives › Paper Detail

Economic Evaluation of Different Proposal of Highway Project: - A Case Study of Naroda Railway Crossing

Vaghela Dhavalsinh , Srinath Karli, Vrundani vaidhya, Smit bhatt
M.E. student, Transportation engineering, Hasmukh goswami college of engineering, India
Vol. 5, Issue 4 pp. 436-442 🌐 Open Access

ABSTRACT

In the absence of insufficient, fast and reliable public transport system more and more people are shifting to personal vehicles in most of the cities, which results in massive growth of automobile population around the world. Due to fast growing private vehicular traffic and poor public transportation most of city corridors become congested. At that time we think about for LRT system, Metro trains, and BRTS system to divert this personalized traffic volume. For fast and safe movement of traffic fly over and over bridge is essential at Road-Road and Rail-Road intersection. Transportation is tool to transport goods and people from one place to another. An investment in highways of other facilities generates benefits in the form of lowering the transportation costs for movements. It also enhances the level of GDP through mobilization of unemployed factors of production. This helps for economic growth and development. Reduction in transportation costs can be realized in numerous ways, such as reduction in travel time, Decrease in VOC, increased safety and reduction in the level of air and noise pollution. But in the final analysis all benefits of road, and therefore the justification for constructing it, flow from using it for transportation. So it can be said that all the road investments should be “Need-Based” and be made only when they lower the transportation cost. It is enough to warrant their investment costs i.e. including the present value of future maintained. This analogy has to be viewed with future impact study of a proposed transportation projects. Now a day, the issue of identification, forecasting and measuring the impact due to implementation of many transportation projects is the central issue of concern in transportation planning. The big projects influence the neighbouring environment. It is not only important but essential to understand development impact of the proposed road project and to evaluate an appropriate strategy for implementation of its financial availability, economic evaluation is requiring. The scope of the present study consist of evaluating the impact on traffic, initial social and Environment screening and checking and financial viability of the project. For the case study construction of ROB at intersection of Nana Chiloda-Naroda Road with “Ahmedabad Udaipur M.G. line at Narodas Crossing L.C.No.9” is selected. There is a fixed delay for 2 hr. and 01minute duration in 24hr. due to gate closing. For the dispersion of the traffic, waiting in queue cause operational delay. The project has benefits like fuel saving, travel time saving. The project is evaluated by using very economic evaluation methods for viability of the project.

Keywords: Platoon, Platoon dispersion, Platoon ratio, Passenger car unit, Congestion

📄 Submit Your Paper

Open Access • Double-Blind Peer Reviewed
UGC Approved • Quarterly Publication

Submit Now →
📅 Submission Deadline
N/A
Vol. 9 | Issue 12 | December