REDUCTION IN LEAD TIME AT TOOL INDUSTRY
Amit Galphade, Chintan Charola, Parth Gupta, Vikas Thakur
Assistant Professor, Department of Mechanical Engineering, SRICT, India
Abstract
Productivity is very important aspect of any industry. So when complete product is manufactured it is very important to have it at appointed time, but sometime it is not possible for an industry to maintain this punctuality so for that ideal time in the system has to be minimized to get the system working efficiently and to get maximum productivity. There are enormous numbers of products produced in tool industry but here more focus has been converged to the Taper Shank tool manufacturing. Bottlenecks in the process of its production is found by using OPC and FPC and by noting and comparing the practical and theoretically described time consumed in performing activities of the production in order to achieve the desired goal of the industry that is to maximize the production and minimize the cost hence making product quality products and cost efficient.
Keywords
How to cite
Amit Galphade, Chintan Charola, Parth Gupta, Vikas Thakur (2017). REDUCTION IN LEAD TIME AT TOOL INDUSTRY. IJAREST, 4(2), 179-183.
BibTeX
@article{ijarest2017CA40F9,
title={{REDUCTION IN LEAD TIME AT TOOL INDUSTRY}},
author={Amit Galphade and Chintan Charola and Parth Gupta and Vikas Thakur},
journal={IJAREST},
volume={4},
number={2},
pages={179-183},
year={2017}
}Published under an open-access licence. See copyright & licensing.