📢 NOTICE Call For Paper – Vol. 9, Issue 12 (December)  |  Submission Deadline: N/A  |  IJAREST is UGC Approved (Sr. No. 63628)  |  e-ISSN: 2394-3394  |  Submit original, unpublished research papers in Engineering, Science & Technology  |  Fast peer review (12–15 weeks)  |  Open Access – Free to Read  |  Contact: editor@ijarest.org

Paper Details

Home › Archives › Paper Detail

A Review on Scope, Study & Need of Setup Time Reduction for Conveyor Pulley Manufacturing

Purvi Chauhan , Shyam Rangrej, Kaustubh Samvatsar, Jigar Patel
Production Engineering Department, Birla Vishvakarma Mahavidyalaya, Vallabh Vidyanagar, India
Vol. 2, Issue 3 pp. 29-33 🌐 Open Access

ABSTRACT

A systematic approach is essential for modeling and determination of optimum operating conditions which helps in process quality improvement. Moreover it attempts to provide the user with flexibility to adopt appropriate techniques based on their inherent potential. The designed solutions considering desired production requirements for intended studies can be helpful in increasing the productivity. It can be achieved by adopting lean principles and standardized processes which thereby leading to fulfillment of customer needs. The present study encompasses the different techniques for a case of set-up time reduction of conveyor pulley manufacturing. Five different techniques and a specific Mechatronics approach are considered.

Keywords: Conveyor pulley, Lean manufacturing, Just-in-time, Kanban, SMED, 5S, Mechatronics