Roller Compacted Concrete Pavement
Keywords:
roller compacted concrete, Road, Pavement, compressive strength, grade of concrete, water cement ratio, curing, admixtureAbstract
The aim of this research is to check the suitability of roller compacted pavement in India. In order to check suitability, samples of
M40 grade concrete with 0, 10, 20, 30% replacement of cement by fly ash is tested in the laboratory for compressive and tensile
Strength for different time periods (i.e. 3days, 7days, 14days, and 28days). It is cured for 28 days.