Future Needs of High Power Transmission by Gas Insulated Transmission Line

Authors

  • Ansari Habiburrahman Electrical Engineering department, SVKM’s IOT, Dhule
  • Kishor Gawale Electrical Engineering department, PES COE aurangaba

Keywords:

component; GIS: Gas Insulated Substations, GITL: Gas Insulated Transmission Line

Abstract

A new and latest technology used world-wide level from many decades, Known as Gas Insulated
Transmission System. Normally air as an insulated medium used in overhead transmission line, but these line
replaced by GITL. GITL as underground, directly buried, under tunnel connected lines in power system. In last
45 years of GITL history, it will know for high power transmission capabilities. In world-wide level, very first
time the GITL installed in Switzerland at Geneva airport and similarly at Bangkok, Thailand within substations.
As the advancement of GITL, next generation of GITL installed over a very long distances as good alternative of
overhead transmission line. In second generation many countries adopted gas insulated transmission line
technology like China, Germany etc. This paper discuss with how GITL technology fulfill the future needs of high
power transmission.

Published

2020-05-25

How to Cite

Ansari Habiburrahman, & Kishor Gawale. (2020). Future Needs of High Power Transmission by Gas Insulated Transmission Line. International Journal of Advance Research in Engineering, Science & Technology, 7(5), 23–24. Retrieved from https://ijarest.org/index.php/ijarest/article/view/1988